View Issue Details
| ID | Project | Category | View Status | Date Submitted | Last Update |
|---|---|---|---|---|---|
| 0001708 | T99X171.00 SKB Eagle | HW | public | 2023-04-17 16:27 | 2025-04-07 10:21 |
| Reporter | (ALTech) SH Son | Assigned To | (HW) Sean Chiang | Due Date | 2023-05-01 17:33 |
| Priority | normal | Severity | s3-moderate | Reproducibility | have not tried |
| Status | closed | Resolution | fixed | ||
| Summary | 0001708: [Eagle] SKB New Housing Material_ABS Test report_PC mold with ABS | ||||
| Description | For short term solution about ABS housing. please test and upload below test item. 1. IR test 2. Thermal Shock 3. Drop test 4. Logo/Printing Abrasion Test 5. Pencil hardness test 6. Chassis Static Load 7. top / bottom assembly test 8. thermal test. This injection condition is conditional mass production Apr 26K and May 26K. | ||||
| Tags | No tags attached. | ||||
| Attach Tags | |||||
| related to | 0001557 | closed | SKB New Housing Material_ABS | |
| related to | 0001617 | closed | (HW) Sean Chiang | [Eagle] SKB New Housing Material_ABS Test report |
| User List |
(ALTech) BY Lee , (ALTech) Hyunsik Kim , (ALTech) JW Kim , (ALTech) Lonnie Kim , (ALTech) SH Son , (ALTech) Sophie Lee , |
|---|
|
|
condition of PC mold with ABS |
|
|
Hi Miya Please confirm the bottom cover assembly condition for Apr 26K and May 26K - PC+ABS or ABS Thanks SON |
|
|
HI Sean Please update the test report for short term solution about PC mold with ABS. - Reliability test: 4/24(Mon) ~ 5/5(Fri) - Target date for providing the reliability test report: 5/11(Thu) - Remarks: We need to submit at least the report for the IR test and Chassis Static Load, so please provide those reports by 4/24(Mon) for approval. Thanks SON |
|
|
Hi, Sean About 2 items. you shall submit ASAP. - IR test -Chassis Static Load You shall submit report at least 4/24. Best regards Lonnie Kim |
|
|
Hi Lonnie and SH, We've asked the supplier to send 3pcs housing to our RD office urgently then RD can rework samples by itself and perform the test earler to try to meet your requirement. However, our supplier still needs some time to apply to express internally now and then be able to send us the samples. Therefore, I can't have a schedule to confirm when we can complete the test and provide the report. I will update you when we get a confirmed delivery schedule from the supplier NWE. Regards, Sean |
|
|
Hi Sean and Mia, We just sent 4pcs of the Eagle housing made of the old mold with ABS material from NN. It will be arrived on 4/24 (Mon). The samples(上) we have sent you are NG about the cosmetic status, but I believe there would be no issue for IR and chassis static test. Hence, please help to proceed with the two kinds of reliability tests ASAP. Below is tracking no. and let us know if there is any update. * Fedex: 771919743246 BR, Emma |
|
|
Hi Lonnie, SH and Emma, The attached file IR sentitivity and Chassis static load report are tested using PC mold and housing made of ABS material. Both tests are passed and meet the requirements. Please review it and let us know if you have any further questions. Regards, Sean |
|
|
Hi SH, Sorry I forgot to upload comparison report of Old/New/Apr+May Housing. Please check. Thanks Miya |
|
|
Hi SH, Here is assembly verification report for new housing of old mold+ABS(Apr/May MP version). Thanks Miya |
|
|
HI Miya Please check my comment. 1. part description update 2. check materiel : as my understand that the resin is not change (MABS TR557 HB). but this report said abs/mabs. Is it a simple typo or is the resin changed? 3. Please update with bottom cover assembly test report Thanks SON |
|
|
HI Sean Chiang 0001708:0012984 confirm the IR sensitivity and Chassis static load test report for PC mold and housing made of ABS material. Thank you for quickly support. Thanks SON |
|
|
Hi Mr.SH Son I would like send to you control run new housing (PC mold) of Eagle Please kindly check and feedback to us if you have any question. Thanks ~ |
|
|
HI Yuri and Miya. I confirm the housing assembly verification report There is no problem. thanks SON |
|
|
Hi SH, Please find attachment for the final reliability test report (using PC mold with ABS material). All the test items are passed and meet the requirement. Please check it and let me know if you have any further questions. Thanks. Regards, Sean |
|
|
Hi Sean 0001708:0013151 I review the test report, and confirm it. as tested result, the PC mold with ABS housing (Short term) is approved the mass production until new ABS mold (Jun 2023) Thank you for support. Thanks SON |
|
|
Closed |
| Date Modified | Username | Field | Change |
|---|---|---|---|
| 2023-04-17 16:27 | (ALTech) SH Son | New Issue | |
| 2023-04-17 16:28 | (ALTech) SH Son | Issue Monitored: (ALTech) BY Lee | |
| 2023-04-17 16:28 | (ALTech) SH Son | Issue Monitored: (ALTech) Hyunsik Kim | |
| 2023-04-17 16:28 | (ALTech) SH Son | Issue Monitored: (ALTech) JW Kim | |
| 2023-04-17 16:28 | (ALTech) SH Son | Issue Monitored: (ALTech) Lonnie Kim | |
| 2023-04-17 16:28 | (ALTech) SH Son | Issue Monitored: (ALTech) SH Son | |
| 2023-04-17 16:28 | (ALTech) SH Son | Issue Monitored: (ALTech) Sophie Lee | |
| 2023-04-17 16:28 | (ALTech) SH Son | Issue Monitored: (ALTech) SY Yoon | |
| 2023-04-17 16:28 | (ALTech) SH Son | Issue Monitored: (HW) Cooper Kung | |
| 2023-04-17 16:28 | (ALTech) SH Son | Issue Monitored: (HW) Sean Chiang | |
| 2023-04-17 16:28 | (ALTech) SH Son | Issue Monitored: (HW) Tom Lee | |
| 2023-04-17 16:28 | (ALTech) SH Son | Issue Monitored: (PM) Dennis Lu | |
| 2023-04-17 16:28 | (ALTech) SH Son | Issue Monitored: (PM) Tiffanie Lai | |
| 2023-04-17 16:28 | (ALTech) SH Son | Issue Monitored: (Sales) Miya Wang | |
| 2023-04-17 16:28 | (ALTech) SH Son | Relationship added | related to 0001557 |
| 2023-04-17 16:29 | (ALTech) SH Son | Note Added: 0012893 | |
| 2023-04-17 16:29 | (ALTech) SH Son | File Added: image.png | |
| 2023-04-17 16:30 | (ALTech) SH Son | Note Added: 0012894 | |
| 2023-04-17 16:30 | (ALTech) SH Son | File Added: image-2.png | |
| 2023-04-17 16:31 | (ALTech) SH Son | Assigned To | => (HW) Sean Chiang |
| 2023-04-17 16:31 | (ALTech) SH Son | Status | new => assigned |
| 2023-04-17 16:32 | (ALTech) SH Son | Note Added: 0012895 | |
| 2023-04-17 16:33 | (ALTech) SH Son | Due Date | => 2023-05-01 17:33 |
| 2023-04-17 16:35 | (ALTech) SH Son | Note Edited: 0012894 | |
| 2023-04-17 16:37 | (SW) Kerwin Chen | Severity | s2-severe => s3-moderate |
| 2023-04-18 09:08 | (ALTech) Lonnie Kim | Note Added: 0012902 | |
| 2023-04-18 11:52 | (ALTech) SH Son | Note Edited: 0012895 | |
| 2023-04-18 12:03 | (ALTech) SH Son | Relationship added | related to 0001617 |
| 2023-04-20 12:23 | (HW) Sean Chiang | Note Added: 0012927 | |
| 2023-04-21 15:45 | (ALTech) BY Lee | Note Added: 0012951 | |
| 2023-04-24 20:22 | (HW) Sean Chiang | Note Added: 0012984 | |
| 2023-04-24 20:22 | (HW) Sean Chiang | File Added: Reliability test report for T99X171.00_2023-04-24.pdf | |
| 2023-04-24 20:22 | (HW) Sean Chiang | File Added: T99X171T00 V025_IR range test_ABS_old mold for PC 20230424.pdf | |
| 2023-04-25 09:32 |
|
Note Added: 0012988 | |
| 2023-04-25 09:32 |
|
File Added: Comparison of new Housing and old housing-20230417.pdf | |
| 2023-04-26 08:43 |
|
Note Added: 0013002 | |
| 2023-04-26 08:43 |
|
File Added: T99X171.00VerifythenewhousingofNWE-24042023.pptx.pdf | |
| 2023-04-26 11:12 | (ALTech) SH Son | Note Added: 0013003 | |
| 2023-04-26 11:12 | (ALTech) SH Son | File Added: image-3.png | |
| 2023-04-26 13:34 | (ALTech) SH Son | Note Added: 0013006 | |
| 2023-04-26 19:49 |
|
Note Added: 0013016 | |
| 2023-04-26 19:49 |
|
File Added: Control Run New Housing(PC mold) of T99X171.00 Product - 24042023.pptx.pptx | |
| 2023-04-27 07:28 | (ALTech) SH Son | Note Added: 0013017 | |
| 2023-05-16 20:31 | (HW) Sean Chiang | Note Added: 0013151 | |
| 2023-05-16 20:31 | (HW) Sean Chiang | File Added: Reliability Test Report for T99X171.00 _ 2023-05-15.pdf | |
| 2023-05-17 07:16 |
|
Issue Monitored: (ALTech) Sun Choul Joung | |
| 2023-05-17 11:21 | (ALTech) SH Son | Note Added: 0013156 | |
| 2023-05-17 11:21 | (ALTech) SH Son | Status | assigned => confirmed |
| 2025-04-07 10:21 | (HW) Sean Chiang | Status | confirmed => closed |
| 2025-04-07 10:21 | (HW) Sean Chiang | Resolution | open => fixed |
| 2025-04-07 10:21 | (HW) Sean Chiang | Note Added: 0017453 |